Timely repairs or just cleaning the pipeline (though whether it is plumbing, though the pipeline, though any other communication) blockage - is the key to its normal functioning.
Mounted trailer (standard tank capacity). Without a generator and a compressor (model 459.220.1). The detailed specification is given below:
Currently our systems are considered the most powerful in the world of peers. Each uses a powerful pumping equipment, which allows the application of extremely high-quality coverage and increase productivity by almost 50% in comparison with competitive pumping systems. In general, a 459 is used for the deposition of a thick coating of high viscosity on pipes with diameters of 50 to 1500 mm.
The standard delivery set includes hose reel and winch that allows to coat the pipe lengths up to 220 m long.
Equipment allows you to work with and provides quick-drying materials and mixing loose components within one minute. Besides various provided for spraying materials from polyurethane - quick-polymeric protection system, - to epoxy resin. Planned working material specified by the customer before production of the installation. A plurality of mixing of the components and one for the transition from one material to another.
Typically, the unit is mounted on a sled or trailer, and include the following components:
Mounted trailer / sled / car;
Tanks for the storage of materials;
Pumping and measuring equipment;
System supplying high-pressure fluid;
Winch and hose reel;
Umbilical hose;
Built-in mixer and sprayed working head for pipe diameters from 50 - 1500 mm;
This equipment makes it possible not only to carry out building new networks without excavation, produce punctures under highways, railroads with the installation of steel casings up to 25 m, but also to repair work of water supply, sewerage and heating system to 115 ° C, increasing to 30% the diameter of the existing pipeline.
With the destruction of the old pipeline combinable head breaks his knife in half the old pipe and the new pipe is pulled inside the old with the help of the hydraulic machine. Penetration length depending on the ground can reach 200 m.
Trenchless installation of AC-60 (120) manufactured by climate conditions for the execution of "U1" category 1, storage conditions - ZHZ GOST 15150.
Gas paraffin crude oils is complicated by deposition on the surfaces on endosulphan GCPS, the underground and ground equipment and landlines. Consumables up to the present time methods to combat open campfire make one deposits: inhibition, handling hot petroleum products etc., Crackers and are associated with a lot. Other ways to combat the deposits paraffin is, based on the use of permanent magnets, ultrasound, also do not show effectiveness in practice. The method, based on the exploration dewaxing Enercat is very promising. The general principle of the work of dewaxing Enercat is the following: Quartz crystals are arranged in the housing dewaxer so that when due to turbulent flow of oil takes place "wobble", generates electromagnetic waves of a certain frequency. These waves penetrate through the inner casing dewaxer affect rising by tubing oil, resulting in micellar structure of paraffins and asphaltenes contained in the oil remains in the form in which it was at reservoir conditions.
Enercat - a submersible instrument used for the prevention and removal of paraffin and asphaltene in oil production. It can be installed in any well, docking with the tubing string - tubing (tubing) by a threaded connection. Exceptions are wells that used electric submersible pumps (ESP), a strong electric field generated by electric submersible pumps installed, prevents full operation dewaxer.
A. The inner shell Metal in corrosion - resistant performance (resistance to gray - Hydrogen corrosion), short pump - compressor tube, ends having threaded connections, which are embedded in acting pump design - tubing.
B. The outer casing Metal outer casing welded to the inner housing dewaxer and serves to support the internal filler.
C. Fillers The filler consists of a quartz crystal connected with particle semiprecious metals, filled aluminium alloy.
D. Turbulent flow oil Advantages over other types of dewaxing.
- Elimination of the required time-consuming and expensive works on hot oil dewaxing, inhibiting application; - Disposable installation, maintenance-free and the external power supply; - Ability to reinstall on another well; - No damage to the drill rod or pump due to the formation of wax or asphaltenes; - Increasing the lifetime and performance of the equipment; - Clean the surface of the wellbore and reservoir.
Picture above shows the results of the units indicating the flow rate of oil production. Installing Enercat is not radioactive and magnetic.
Conclusion Through the use of dewaxer Enercat number of oil companies of the world, such as TAG Oil Ltd. (New Zealand), Shell Canada Limited, Sinopec (Argentina), NAL Energy Corp. (Canada), Lease Operators Ltd. (Trinidad), Crown Point Oil & Gas (Argentina) and several others have made significant cost reduction methods for dealing with paraffin deposits, as well as increased production of each individual within the time interval of well tools.
Our company is a distributor of downhole dewaxer Enercat produced in Canada. We are ready to analyze the situation with paraffin on your deposits and offer solutions based on dewaxer Enercat.
In Moscow from 12 to 14 March in the hotel "Holiday Inn Simonovsky" was held the international conference "Tunnel Russia 2014". With support from: the Department of construction in the Moscow Region and the supervisory committee for the constructions projects. Official site of conference: www.tunnelrussiа.соm
A request for photos and presentations from conference can be required via the site contact form.
DESIGN AND TUNNEL TRENCHLESS TRANSITIONS, 23 - 25 October 2013, Moscow
We express our appreciation and gratitude to the sponsors of the event:
LLC “SOYUZDONSTROY " - a leading company in the field of trenchless construction networks virtually all existing methods as well as all the speakers and participants .
European and Russian experts were consecrated a number of topical issues in the field of design and construction of trenchless crossings:
Features of the development and coordination of the design - budget documentation for construction of engineering infrastructure Trenchless technology piping with modern regulations in projects «PIRS." Issues in the design and construction
Design of external engineering networks. Practical experience in Russia Construction standards and criteria for pipe driving techniques and micro-tunnelling segment electrode
Design experience in Western Europe Features of building relationships with the customer. System turnkey EPC. Order to sign the contract, the approach to engineering and geological surveys
Technology Quality Control insulation coating transitions performed by directional drilling and recovery of regulatory status and full operation of such transitions when it detects abnormal damage to them without opening the insulation fault location
Design and installation of pipelines transitions by horizontal directional drilling. Requirements engineering research
HDD and microtunnelling design development, which is impossible to forget. Requirements engineering research
Design and construction of pipelines transitions through the barriers by Microtunneling
Technology and microtunnelling in pipe jacking trenchless construction and conversions for pipelines using a pre- curved tubes in the construction of underwater passages trenchless method.
Practical Course:
DESIGN AND TUNNEL TRENCHLESS TRANSITIONS, 23 - 25 October 2013, Moscow
We express our appreciation and gratitude to the sponsors of the event:
LLC “SOYUZDONSTROY " - a leading company in the field of trenchless construction networks virtually all existing methods as well as all the speakers and participants .
European and Russian experts were consecrated a number of topical issues in the field of design and construction of trenchless crossings:
Features of the development and coordination of the design - budget documentation for construction of engineering infrastructure Trenchless technology piping with modern regulations in projects «PIRS." Issues in the design and construction
Design of external engineering networks. Practical experience in Russia Construction standards and criteria for pipe driving techniques and micro-tunnelling segment electrode
Design experience in Western Europe Features of building relationships with the customer. System turnkey EPC. Order to sign the contract, the approach to engineering and geological surveys
Technology Quality Control insulation coating transitions performed by directional drilling and recovery of regulatory status and full operation of such transitions when it detects abnormal damage to them without opening the insulation fault location
Design and installation of pipelines transitions by horizontal directional drilling. Requirements engineering research
HDD and microtunnelling design development, which is impossible to forget. Requirements engineering research
Design and construction of pipelines transitions through the barriers by Microtunneling
Technology and microtunnelling in pipe jacking trenchless construction and conversions for pipelines using a pre- curved tubes in the construction of underwater passages trenchless method.
Feedback from participants:
"I personally got in such a short time a large amount of very useful technical information . Special thanks to the organizers "
Practical Course:
DESIGN AND TUNNEL TRENCHLESS TRANSITIONS, 23 - 25 October 2013, Moscow
We express our appreciation and gratitude to the sponsors of the event:
LLC “SOYUZDONSTROY " - a leading company in the field of trenchless construction networks virtually all existing methods as well as all the speakers and participants .
European and Russian experts were consecrated a number of topical issues in the field of design and construction of trenchless crossings:
Features of the development and coordination of the design - budget documentation for construction of engineering infrastructure Trenchless technology piping with modern regulations in projects «PIRS." Issues in the design and construction
Design of external engineering networks. Practical experience in Russia Construction standards and criteria for pipe driving techniques and micro-tunnelling segment electrode
Design experience in Western Europe Features of building relationships with the customer. System turnkey EPC. Order to sign the contract, the approach to engineering and geological surveys
Technology Quality Control insulation coating transitions performed by directional drilling and recovery of regulatory status and full operation of such transitions when it detects abnormal damage to them without opening the insulation fault location
Design and installation of pipelines transitions by horizontal directional drilling. Requirements engineering research
HDD and microtunnelling design development, which is impossible to forget. Requirements engineering research
Design and construction of pipelines transitions through the barriers by Microtunneling
Technology and microtunnelling in pipe jacking trenchless construction and conversions for pipelines using a pre- curved tubes in the construction of underwater passages trenchless method.
Feedback from participants:
"I personally got in such a short time a large amount of very useful technical information . Special thanks to the organizers "
Alfred Bekshenev , Deputy. General Manager, Chief Engineer of JSC " PIER " ( Russia )
" Very useful "
Evgeny Zaytsev , Deputy. Head of Department -early. linear sector , PJSC " YuzhNIIgiprogaz " (Ukraine)
" I'd love to see at such events more often "
Chukhley Alexander , director of the mission, "SP VIS-MOS " (Russia)
27 - May 31, 2013 in Amsterdam held technical exchange program:
NEW BUILDING TECHNOLOGIES: EXTENDED TRENCHLESS TRANSITIONS IN CASE OF LARGE DIAMETERS
Feedback from participants:
"I want to thank you for organizing the program of technical exchange” New construction technology transitions for trenchless pipelines. "
“My stay in Amsterdam was fruitful and interesting.”
“With pleasure I will participate in future events held by your company.”
Maxim Schmal , Deputy. General Director for Capital Construction , LUKOIL
“I would like to express my gratitude for the seminar - “New technologies trenchless construction of extended transitions and transitions for large diameter pipelines.”
“The course left very good impression.”
“Ample, rich, covered all the questions which I had before the course, interesting lectures, interesting technical visits and projects under construction.”
“Very pleasant and friendly chat with all the participants."
Inventor Industries specialists have been on the forefront of deployment of new solutions and advanced technologies for trenchless pipeline construction, rehabilitation and integrity management since 1994. The company is also actively involved in providing equipment sourcing and engineering supervision for construction and rehabilitation of utility and oil and gas pipelines. Among our utility partners are St. Petersburg Water Authority (Vodokanal of St. Petersburg), a member of Rosvodokanal group LuganskVoda and its contractors, the Association of Water Suppliers of Kazakhstan, Centre for Utility Infrastructure Development of Kazakhstan and a number of others.